#406

Under Construction

Natura Park 2

Famagusta and Outskirts, Iskele, Iskele
Under Construction
30/12/2026

Description

Introducing Natura Park Complex Phase 2, a luxurious real estate development located in the heart of Iskele, North Cyprus.

Natura Park 2 is conveniently located just a 35-minute drive from Ercan airport and a 55-minute drive from Larnaca airport. The complex is surrounded by various amenities, with local village shops and restaurants just a 3-minute walk away, and markets, supermarkets, and malls in the town of Iskele a mere 5-minute drive away. The beautiful Long Beach is just a 3-minute drive away, and a local beach is even closer, making it an ideal location for beach lovers.

The complex comprises 28 units of 2+1 apartments, 6 units of 1+1 apartments, 4 units of 3+1 loft apartments, and 6 units of 2+1 semi-detached villas. Each unit is designed with the highest standards in mind, featuring a variety of quality floor and bathroom ceramic tiles, laminate, and WC and bathroom faience and accessories. The bathroom faience and WC are of Hilton standard, ensuring a luxurious feel. The kitchens are fitted with luxury appliances, and each bedroom comes with a fitted wardrobe and entrance cabinet. The units also feature aluminum double glazed windows, glass windows at the stairs, and an aluminum railing.

Additional features include a hydrophore system and solar panel water heating system, central TV satellite and internet system, air conditioner infrastructure, and a parking place for every apartment. For those seeking extra luxury, there are additional options such as a swimming pool for semi-detached villas and a floor heating system.

The complex also boasts a range of communal facilities including a swimming pool, kids pool, fitness center, sauna, café with a cozy terrace, modern tennis courts, kids playground, and a shady park area. Security is a top priority, with security cameras around the complex and a controlled territory entrance. A backup electricity generator is also available to ensure uninterrupted power supply.

Construction for Natura Park 2 has begun in December 2023 and is expected to be completed by December 2026. The payment plan is flexible, with 40% downpayment, 40% payable up to key handover and an additional 20% payable over 12 months, interest-free.

Contact us today for more information.

Enquire form

    Available Properties

    Type
    Beds
    Baths
    Internal Area
    Parking
    Price
    !

    Near By

    Location & Amenities

    University

    12.00 km km

    Airport

    51.00 km km

    Shops & Markets

    1.31 km km

    Primary Schools

    9.00 km km

    Hospital

    6.00 km km

    Beach

    0.50 km km